E-PORTFOLIO
Project 1: Industrialised building system
In this project, we are required to study about the application of IBS system in buildings in Malaysia. First, we are required to select or design an apartment building of 3-storeys with the application of IBS system mainly precast system into our building. Our building should be exceed 100 square meter.
At the end of this project, we would need to produce a scaled model of 1:30/1:40 of our apartment building which shows a part of section to showcase the details of the construction of IBS in our building. We also need to produce a video which recorded the process of our model construction and also the details of the connection of the IBS components, the video also need to include the IBS score and also Embodied Energy calculation.
Bound report:
Project 2: Construction solution
This assignment is aligned with our studio 5 project which is a community library which required us to propose the construction method for our building. We are required to apply the right method into our building proposal in coordination with proper technical studies and development of our design. It also required the integration of more unique technical method into our building design proposal.
